Findings and recommendations your team can use.
Reports are selected around your agreed sites and decisions. Each states its sources, assumptions and remaining design work. For repeatable site screening, explore DataCrate software; tailored advisory remains specific to your project, and a workspace is not required to receive delivered reports.
Decision Record Specimen · Evidence Register
Pine Ridge Valley Campus
Early Screening Assessment — Conditional Hold
Illustrative Gateway Power evidence register distinguishing confirmed, supplier-indicated, assumed and unresolved findings| Workstream | Finding | Evidence basis | Next action to close |
|---|
| Grid & Interconnection | 230 kV transmission corridor mapped within 1.8 miles; no committed ISO queue capacity established. | Confirmed | File formal utility screening & confirm substation bay availability. |
|---|
| Phased BTM Supply | Modular gas-engine + transient BESS bridge sized for Phase 1 ramp under ambient derating. | Supplier-indicated | Reconcile heat-rate curves, emissions limits & indicative production windows. |
|---|
| Water & Thermal | Closed-loop dry cooling avoids evaporative tower water draw during peak summer wet-bulb. | Assumed | Confirm tenant liquid-cooling supply temperatures & parasitic fan load. |
|---|
| Fuel & Permitting | High-pressure natural gas lateral capacity and air-permit NOx ceiling remain unverified. | Unresolved | Commission pipeline pressure letter & desktop air-permitting pathway brief. |
|---|
Example decision-record format
Early screening assessment
Power, water, cooling, land and infrastructure screen: constraints, opportunities, evidence gaps and next diligence actions.
Generation and impact validation
Scenario-based firm-capacity, generation, grid, fuel, cooling and water analysis against the agreed load and resilience basis.
Test fit and site layout analysis
Conceptual campus and generation layout, infrastructure allowances, setbacks, access and constraints.
Environmental and permitting screening
Desktop environmental and permitting-pathway assessment: emissions, flood, wetlands, habitat and water constraints.
Financial viability report
Scenario economics, capital and operating costs, LCOE, cash flow, NPV, IRR and sensitivities using agreed inputs.
Supply chain risk report
Equipment and supplier exposure, quotation evidence, lead-time dependencies, scope gaps and procurement risks.
Connectivity feasibility study
Fiber routes, carrier availability, diversity, latency assumptions and network resilience.
Public sentiment report
Stakeholder map, concerns, public-record themes, comparable projects and engagement priorities.
Custom brief
A focused report answering agreed questions, with evidence, red flags and recommended actions.
Go / no-go decision guide
A consolidated decision view drawn from the site reports: findings, unresolved conditions, decision gates and the recommended next step.
Scope and specialist studies
Tailored work includes detailed power strategy, water and cooling strategy, portfolio and site comparison, supplier and procurement reviews, and executive decision memoranda. Reports do not confer utility commitments, permits or professional certification; where licensed sign-off or formal studies are required, we help commission and review the qualified specialist’s work.